Family-run Geisa Fabrics, a fabric producer for more than 50 years, was looking for a renewables-based solution to its energy needs. After exploring the client’s requirements in detail, BayWa r.e. recommended a three-tiered solution that would complement the company’s existing Burgos factory co-generation system.

The three different technologies applied for this location were roof-top PV, a ground-mounted PV installation and a solar carport including a charging station for e-mobility. 

With a power of up to 820 kW in total, the resulting PV-based integrated energy solution is distributed between the warehouse roof, a ground-mounted installation located on a plot of land adjacent to the factory and a solar carport which provides three charging stations for electric vehicles. This installation was financed via a leasing model, without the requirement for any initial investment by the customer.

Ground-mounted installation
41.7 MWp of installed capacity
73 GWh of annual output

local case study

España

Geisa Fabrics

Family-run Geisa Fabrics, a fabric producer for more than 50 years, was looking for a renewables-based solution to its energy needs. After exploring the client’s requirements in detail, BayWa r.e. recommended a three-tiered solution that would complement the company’s existing Burgos factory co-generation system.

The three different technologies applied for this location were roof-top PV, a ground-mounted PV installation and a solar carport including a charging station for e-mobility. 

With a power of up to 820 kW in total, the resulting PV-based integrated energy solution is distributed between the warehouse roof, a ground-mounted installation located on a plot of land adjacent to the factory and a solar carport which provides three charging stations for electric vehicles. This installation was financed via a leasing model, without the requirement for any initial investment by the customer.

Ground-mounted installation
41.7 MWp of installed capacity
73 GWh of annual output

Project Location

Project TypeGround-mounted photovoltaic plant in Valladolid, Spain
Total output41.7 MWp
StructuresZimmerman
ModulesTrina
InvertersHuawei
Output73 GWh/a year
Area90 ha
Business areaTurnkey construction, operations management